logo

PathLok Stabilization Mat: Instant Upgrade for Muddy Roads and Trails

80㎡
MOQ
Inquire anytime
preço
PathLok Stabilization Mat: Instant Upgrade for Muddy Roads and Trails
Características Galeria Descrição de produto Peça umas citações
Características
Especificações
Material: Fibras têxteis e cimento em pó
Largura: 4m
Comprimento: 20m-50m
Especificação: 6 kg-25 kg/m2
Destacar:

Instant Upgrade PathLok Stabilization Mat

,

Muddy Roads PathLok Stabilization Mat

Informação básica
Lugar de origem: China
Marca: JIANYI
Certificação: ISO9001
Condições de Pagamento e Envio
Detalhes da embalagem: Embalagens exteriores impermeáveis e à poeira
Tempo de entrega: 5-8 dias úteis
Termos de pagamento: T/T
Habilidade da fonte: 600t/month
Descrição de produto

Product Description:
Tackle troublesome muddy terrain head-on with PathLok, the heavy-duty cement stabilization mat designed for unpaved access roads, farm tracks, and recreational trails. This industrial-grade mat is manufactured with a tough, non-woven geotextile backing and a high-density cement formulation, creating a product built to bear loads. It acts as an immediate "on-ramp" for vehicles and equipment, preventing the road base from turning into a quagmire. The installation is remarkably simple: unroll, hydrate, and drive. Within hours, it hardens into a semi-flexible, load-bearing concrete layer that locks the subsoil in place and provides a stable, all-weather surface.

Key Features & Benefits:

  • Instant Stabilization: Provides immediate traction for vehicles and machinery, preventing getting stuck in mud.

  • Load-Bearing Capacity: The solidified mat distributes weight evenly, reducing rutting and subsidence.

  • All-Weather Access: Creates a durable surface that remains functional during rain, snow, and thaw cycles.

  • Cost-Effective & Fast: Eliminates the need for repeated gravel applications and expensive earthworks, offering a permanent solution at a fraction of the cost and time.

Primary Applications:

  • Stabilization of Unpaved Access Roads and Farm Tracks

  • Muddy Trail and Bridle Path Hardening

  • Temporary Construction Site Access Roads

  • Event Parking on Grass or Soil

Produtos recomendados
Entre em contato conosco
Pessoa de Contato : Ms. Zhang
Telefone : 86-13332517898
Caracteres restantes(20/3000)