logo

Cement Blanket for Slope Protection - Anti-Erosion Solution for Hillsides, Embankments & Road Slopes

80㎡
MOQ
Inquire anytime
preço
Cement Blanket for Slope Protection - Anti-Erosion Solution for Hillsides, Embankments & Road Slopes
Características Galeria Descrição de produto Peça umas citações
Características
Especificações
Material: Fibras têxteis e cimento em pó
largura: 4m
Comprimento: 20m-50m
Destacar:

cement blanket for slope protection

,

anti-erosion cement blanket

,

hillside protection cement blanket

Informação básica
Lugar de origem: China
Marca: JIANYI
Certificação: ISO9001
Condições de Pagamento e Envio
Detalhes da embalagem: Embalagens exteriores impermeáveis e à poeira
Tempo de entrega: 5-8 dias úteis
Termos de pagamento: T/T
Habilidade da fonte: 600t/month
Descrição de produto
Cement Blanket for Slope Protection
Anti-Erosion Solution for Hillsides, Embankments & Road Slopes
Product Overview
Our Cement Blanket is a flexible, easy-to-deploy slope protection material constructed from high-tensile fiberglass mesh and premium Portland cement. The unique structural design ensures excellent adhesion to slope surfaces, forming a dense, crack-resistant protective layer with high compressive and tensile strength after hydration.
Key Advantages:
  • Lightweight in dry state for easy transport to remote locations
  • No heavy construction machinery required for installation
  • Superior erosion resistance and structural stability
  • Flexible application on various slope configurations
Application Scenarios
Ideal for comprehensive slope protection projects including highway and railway embankments, mountain slopes, riverbank revetments, and mine dump slopes. Effectively prevents soil erosion from rainwater scouring and landslides caused by soil loosening.
Technical Specifications Details
Maximum Slope Angle Up to 60 degrees
Application Areas Rural and urban environments
Environmental Integration Can be covered with soil for vegetation growth
Construction Process
  1. Slope Preparation: Trim slope to remove weeds, tree roots, and loose soil; level uneven areas and compact the surface thoroughly.
  2. Blanket Laying: Unroll cement blanket from top to bottom of slope, ensuring tight fit; overlap adjacent sheets by 12-18cm and secure with U-shaped nails (spacing: 50-80cm).
  3. Watering & Curing: Spray water gently and evenly until blanket is fully soaked; cover with plastic film in strong sunlight or rain conditions. Initial hardening: 3-5 days. Full strength: 7-10 days.
Produtos recomendados
Entre em contato conosco
Pessoa de Contato : Ms. Zhang
Telefone : 86-13332517898
Caracteres restantes(20/3000)